For Companies: pay only 30% with CITB Employer Network Funding
Enquire nowCorby is not a place where one type of construction dominates every site. A supervisor can move from a large logistics or industrial project to residential expansion, public realm work, refurbishment or infrastructure. That variety changes the way supervision feels in practice. The hazards change, the people change and the pace changes, but the supervisor still has to keep the work controlled.
The CITB Site Supervision Safety Training Scheme gives current and future supervisors a structured way to understand that responsibility. The course covers legal duties, communication, occupational health, behavioural safety and the practical control of construction work. For somebody working in Corby, those subjects are not theoretical. They connect directly with the type of development taking place around the town.
Looking for SSSTS training for yourself or your team. Check current SSSTS availability and confirm the delivery option that fits your working week.
The easiest way to understand the local value of SSSTS is to stop thinking about Corby as one construction market. The town combines logistics, manufacturing, large residential growth, highways, public realm and live building refurbishment. Each environment creates different supervisory pressure.
North Northamptonshire Council describes Magna Park Corby as a major development covering around 80 hectares and expected to support more than 7,000 jobs. The wider area also attracts major distribution and fulfilment operations because of its road connections and central position.
What does that mean for a construction supervisor. Large industrial and logistics projects often involve substantial delivery movements, plant, steelwork, cladding, mechanical and electrical installations, service yards, multiple contractors and strict sequencing. The supervisor needs to understand more than the task being completed by one team. They need to see how that task interacts with the rest of the site.
A perfectly reasonable activity can become unsafe when another contractor changes the environment around it. That is why interface management belongs at the centre of practical supervision.
North East Corby is another very different environment. Priors Hall is planned as a development of more than 5,100 homes across three zones. North Northamptonshire Council records that Zone 1 is almost complete and that Zones 2 and 3 include approval for up to 3,500 homes, local centres, primary schools, green infrastructure, roads, drainage and utilities.
Residential construction creates its own supervision pattern. Groundworks sit alongside occupied plots. Delivery routes change as roads are completed. Scaffolds move from plot to plot. Excavations, services, drainage, brickwork, roofing and internal trades can all be active within a relatively compact area. A supervisor who only watches one activity can miss the risk created by the next activity arriving beside it.
The West Corby sustainable urban extension has outline planning for up to 4,500 homes together with employment land, local centres, schools, open space, drainage, access and associated infrastructure. That scale matters because housing growth is never only about houses. Roads, utilities, schools, landscaping, drainage and commercial uses create long sequences of connected construction work.
Corby also has a different type of project in the town centre. In April 2026 a contractor was appointed for the refurbishment of Grosvenor House, with work programmed on a live town centre site. The council described the project as a multi use community and cultural facility and highlighted the need to work around building users and neighbours.
Refurbishment around occupied buildings and public areas can feel very different from a fenced new build site. Access, noise, dust, temporary routes, deliveries and protection of people who are not construction workers become much more visible.
SSSTS is aimed at people who already supervise construction work or are preparing to take on that responsibility. In Corby, the title on the job description can vary widely because the local construction market covers housing, logistics, industrial buildings, infrastructure and refurbishment.
The course can be relevant if you are in any of the following situations.
The common thread is responsibility for people and work. If you regularly decide who does what, where they work, what controls they follow or when a task should stop, supervision is already part of your day even if your job title has not caught up yet.
Many experienced construction workers know how to complete their own trade safely. Supervision adds another layer. You now have to notice what is happening outside your own task. You watch people, access, equipment, neighbouring trades, changing conditions and behaviour.
A supervisor in Corby may need to notice all of the following during one shift.
Good supervision starts when you notice the difference between what was planned and what is actually happening. SSSTS helps put a structure around that habit.
Before the work begins, ask whether the people, equipment, documents and work area match the method that has been agreed. This is the moment to identify missing information, unclear responsibility or a control that cannot actually be maintained.
Construction sites change quickly. A task can begin under suitable conditions and become unsuitable two hours later. The supervisor needs to recognise when a change is small enough to manage within the existing controls and when the method needs to be reviewed.
Stopping work can feel uncomfortable, especially when the programme is under pressure. Yet allowing work to continue without a workable control can create a much larger problem. The professional decision is not the one that keeps everybody busy for the next ten minutes. It is the one that keeps the activity controlled.
Supervision also includes what happens when responsibility changes. A shift ends, a different supervisor takes over or another contractor enters the area. Relevant information needs to move with the work. Open excavations, defective equipment, incomplete barriers, temporary access and unresolved changes should never disappear between handovers.
Risk assessments and method statements are useful because they organise the hazards and controls before the work begins. They become weak when the paperwork is treated as the end of the process.
Imagine a groundworks team working on a new Corby development. The original method assumes clear access, one excavator and no other activity inside the working area. Later a delivery vehicle needs to pass the excavation, another contractor moves materials nearby and the access route becomes narrower. Nobody has rewritten the document, but the real working conditions have changed.
1. Compare the written method with the actual task and work area.
2. Check whether the people carrying out the work understand the controls.
3. Look for changes in plant, access, weather, neighbouring activity or sequence.
4. Escalate the issue when the existing method no longer manages the real risk.
5. Record or communicate the change in the way required by the site management system.
The scale of logistics and industrial development around Corby makes vehicle movement a particularly useful local example. Large sites can involve delivery vehicles, forklifts, telehandlers, mobile plant, cranes, vans and pedestrians moving through neighbouring areas.
The supervisor should understand how routes are separated, where reversing is controlled, who can enter an operating zone and what happens when storage or deliveries change the planned layout.
A route is not safe because it was safe yesterday. It is safe only while the conditions that made it safe still exist.
Housing projects such as Priors Hall can involve many repetitive tasks, which creates a particular supervisory risk. Repetition can make people feel that the next plot will be exactly like the previous one.
In reality, one plot may have different access, a different scaffold condition, another trade working nearby, a service crossing the work area or a delivery blocking the expected route. The method may be familiar while the environment is not.
Town centre and refurbishment projects create a different boundary between construction and everyday life. The people close to the work may be shoppers, office users, residents, visitors or staff who have no reason to understand site hazards.
The supervisor therefore needs to consider temporary barriers, access routes, dust, noise, delivery timing, waste movement, fire routes and how construction traffic interacts with people outside the project team.
The Corby Towns Fund programme includes improvements to pedestrian and cycle connections between the town centre, Tresham College and the railway station along Oakley Road. Projects of this type create a different supervisory problem from a closed housing plot or warehouse shell.
The public may be walking or cycling beside temporary works, deliveries or changing traffic arrangements. A supervisor has to think about barriers, visibility, temporary routes, housekeeping and how work is left outside active hours. The construction team understands the site. The public does not, so the controls need to work without relying on everybody knowing the rules.
One of the most practical parts of SSSTS is the toolbox talk. CITB requires delegates to prepare and deliver a five minute toolbox talk as part of the trainer review.
Five minutes is enough when the message is specific. It becomes too long when the speaker tries to cover every possible hazard at once.
A useful briefing in Corby should answer four simple questions.
1. What are we doing today.
2. What is different about this location or shift.
3. What can hurt somebody during this task.
4. What do we expect people to do if the planned controls stop working.
The aim is not to sound impressive. The aim is to make the team understand what matters before the work starts.
Construction supervisors naturally react quickly to visible danger. A missing barrier, moving plant or an open excavation immediately attracts attention. Occupational health hazards are easier to ignore because the harm may develop slowly.
SSSTS includes occupational health because a supervisor influences whether controls are actually used. Extraction sitting beside the task is not a control if nobody turns it on. Hearing protection in the site office is not protecting the person working beside the noise.
Large residential, logistics and industrial projects can involve people joining a team for a short period, changing employers or arriving with strong general experience but limited knowledge of the specific site. That matters because construction experience is not the same as familiarity with local rules, routes, equipment and interfaces.
A supervisor should not assume that an experienced worker needs no explanation. Equally, somebody who is new should not be overwhelmed with every rule on the site at once. The level of supervision should reflect the task, the risk and the person carrying it out.
Supervision does not mean personally solving every technical problem. Temporary works, lifting operations, electrical isolation, structural issues and specialist activities may require people with defined appointments or specialist competence.
The supervisor needs enough understanding to recognise the problem, protect people and involve the right person. Trying to improvise outside your competence can create more risk than admitting that specialist input is needed.
Already supervising work around Corby and unsure whether SSSTS is the right level. Speak to the CPTS team about your actual responsibilities before booking.
CITB currently lists SSSTS as a two day course for site supervisors. Delegates must attend all 15 hours required by Site Safety Plus.
Teaching includes group work, discussion, construction scenarios, presentations and homework. The course is not assessed only through a final test. Delegates also complete course exercises and the trainer reviews their performance and participation.
CITB scheme rules use construction site drawings and scenarios to help delegates apply the course content. At least one drawing and one related project are used. Delegates can be asked to prepare a risk assessment, method statement or site set up detail for the scenario.
The trainer review looks at more than whether you can remember facts. It considers how you participate in the exercise, listen, cooperate, contribute and complete the toolbox talk.
The examination contains 25 questions and lasts 30 minutes. There are 22 multiple choice questions and three short written questions. A total of 30 marks is available and the pass mark is 24 out of 30.
The paper contains four safety critical questions and all four must be answered correctly. Delegates may use the Construction site supervision GE706 publication during the final ten minutes of the examination.
A delegate who has passed the trainer review and scores 21, 22 or 23 marks while passing the safety critical questions can be eligible for a re sit. A delegate who reaches the overall pass mark but fails the safety critical questions can also be eligible.
Current CITB rules allow the re sit on the same day when suitable preparation time is available, or within the defined period under the scheme rules. If the re sit is failed, the full SSSTS course has to be taken again.
You do not need to arrive having memorised construction law. You will get more value from the course if you arrive with real situations in mind.
1. Think about one task your team repeats every week and identify where conditions usually change.
2. Remember the last time another contractor disrupted your planned sequence.
3. Think of a shortcut that experienced workers sometimes defend because nothing has gone wrong yet.
4. Identify one situation where you were unsure whether you had authority to stop the work.
5. Think about the last toolbox talk you delivered and what the team probably remembered afterwards.
6. Bring the valid identification and joining information required for your chosen course.
One useful way to turn training into site behaviour is to keep a short field note for the first week back at work. Do not write an essay. Record one observation each day.
Write down one thing that changed after the shift started and how it affected the original plan.
Record one place where your team and another contractor influenced each other.
Look for a slow health hazard such as dust, noise, vibration or manual handling that is easy to ignore during a busy shift.
Ask one worker to explain the important control back to you after the briefing. This tells you more than a signature sheet.
Identify one condition that would make you stop or pause the task next time. Being clear in advance makes the decision easier under pressure.
CPTS is based at Airfield Road in Wellingborough and provides SSSTS training for delegates from across North Northamptonshire and beyond. Corby learners may come from Priors Hall Park, Weldon, Great Oakley, Little Stanion, Stanion, Cottingham, Middleton, Rockingham, Gretton and other nearby communities.
Live online SSSTS can also be useful when travelling to classroom training is difficult. Remote delivery is still scheduled instructor led training and delegates need to participate fully in the course and assessment.
See the live online SSSTS course
The next step depends on your actual responsibilities. A supervisor should not choose training simply because one course sounds more senior than another.
See Temporary Works Supervisor training
See Site Environmental Awareness Training
CITB issues a renewable Site Safety Plus certificate after successful completion of SSSTS. The certificate is valid for five years. To keep it current, complete the SSSTS Refresher before the existing certificate expires.
Need SSSTS training for one supervisor or a group from a Corby project. Contact CPTS about dates and course options before you finalise your training plan.
SSSTS is designed for people who have, or are preparing to take on, supervisory responsibilities in construction. Typical delegates include supervisors, foremen, gangers, team leaders and experienced workers moving into supervision.
CITB lists SSSTS as a two day course and requires delegates to attend all 15 hours under Site Safety Plus attendance requirements.
The course covers the role of the supervisor, health and safety law, occupational health, site safety, higher risk activities, environmental responsibilities, communication and behavioural safety.
Yes. CITB scheme rules use construction site drawings and project scenarios. Delegates may be asked to prepare a risk assessment, method statement or site set up detail as part of the exercise.
Yes. The current CITB scheme requires delegates to prepare and deliver a five minute toolbox talk. It forms part of the trainer review.
The current SSSTS examination contains 25 questions. There are 22 multiple choice questions and three short written questions.
The pass mark is 24 out of 30. The examination also contains four safety critical questions and all four must be answered correctly.
The examination lasts 30 minutes.
Delegates may use the Construction site supervision GE706 publication during the final ten minutes of the examination.
A re sit can be available under the CITB scheme rules when the delegate has passed the trainer review and meets the required examination criteria. A failed re sit means the full SSSTS course must be taken again.
The CITB Site Safety Plus SSSTS certificate is valid for five years.
Complete the SSSTS Refresher before the current certificate expires if you want to keep the certification current.
Live online SSSTS can be available as an alternative to classroom delivery. It remains scheduled instructor led training and the normal attendance and assessment requirements still apply.
No. SSSTS focuses on site supervision. SMSTS is aimed at wider site management responsibilities. Choose according to the role you actually perform.
No. Training is an important part of competence, but practical experience, role specific knowledge and assessment by the employer or appropriate senior person still matter.
Corby combines large logistics development, major residential growth, mixed infrastructure and town centre refurbishment. That variety creates practical examples of plant movement, contractor interfaces, changing access, groundworks, public protection and communication.
Use the CPTS booking or contact page to ask about current SSSTS dates, classroom delivery, live online options and group training arrangements.
We appreciate your message and will respond as soon as possible.